Whitbread held a meeting with local residents to hear from demolition contractor, Erith, about the first stage of demolition. This stage will demolish the residual building to theground floor, except for the bridge over corner house street, enabling the scaffolding on The Strand and Craven Street to be removed. You can view the presentation here.  

Leave a Reply

Your email address will not be published. Required fields are marked *